DIY Conservatory     |     Site Map     |     About Us     |     Contact Us     |     Privacy Policy
  • Planning

    • Conservatory Build and Supply companies and warranties
    • Conservatory Design Materials
    • Conservatory Frames and Windows
    • DIY Conservatory Roofs
    • DIY Conservatory Glass
    • Garden Rooms and Gazebos
    • Solving Conservatory Design Problems
    • Conservatory Over Heating
    • Plan Conservatory Layout
    • Conservatory heat loss
    • SAP Ratings and Insulation
    • DIY Conservatory heating
    • Conservatory Condensation
    • Sun lounges and garden rooms
    • Building near the boundary line
    • Permission and Building Regulations
  • Building

    • Conservatory Base
    • Suspended and raised floors
    • Conservatory Walls
    • Conservatory Frames
    • Conservatory Roof
    • Floor and Walls
    • Glossary
  • Finishing

    • Finishing and Furniture
    • Conservatory Blinds
  • Categories

    • Conservatory Questions (165)

Just Had A New Conservatory Built With A Concrete Floor. Floor Was Uneven And They Then Used A Self-leveller.?

..it is still uneven, which we were not aware of until the fitters had put down our laminate flooring. We are now being told by conservatory company that we should have waited 3-4 months before laying laminate floor. We were under the impression that once the concrete went grey it was dry and we were good to go. Who is right? We are trying to claim for the conservatory people to lift and then relay laminate, think this is why they are saying that we should have waited – when we placed order we told them we needed it up and running for Christmas – any help greatly appreciated.

Tags: Built, Concrete, Conservatory, Floor, Just, Then, They, Uneven, With